Q1: What materials can the Cement Vertical Roller Mill process?
A1: It is mainly used for grinding cement clinker, raw meal, slag, gypsum, fly ash, and other cement-related materials. We can also customize it for limestone, pozzolana, or blended materials.
Q2: What is the grinding capacity range?
A2: SYM vertical roller mills can grind from 15 to 300 tons per hour, depending on the model and material characteristics.
Q3: What is the final product fineness?
A3: The fineness can be adjusted between 3000 and 5000 cm²/g (Blaine), which meets the standard requirements for cement production.
Q4: Can the mill handle materials with high moisture content?
A4: Yes, it can handle materials with up to 15% moisture at the feed end. The integrated drying system removes moisture and delivers a final moisture content of less than 1%.
Q5: What are the power requirements?
A5: Power consumption depends on capacity. Motor power ranges from 400 to 5000 kW. Our engineers will recommend the most suitable motor based on your needs.
Q6: What's the delivery time?
A6: Standard delivery time is 30 to 60 working days after receiving the deposit and confirming technical details.
Q7: Do you provide installation and training?
A7: Yes, we provide on-site installation, commissioning, and operator training. Remote support is also available.
Q8: What services do you offer after sales?
A8: We offer 12-month warranty, spare parts supply, remote diagnostics, and long-term maintenance support. A full spare parts list is provided with each machine.
Q9: Can I visit your factory before placing an order?
A9: Absolutely. We warmly welcome you to visit our Shanghai facility, and we can arrange a video call or virtual tour if needed.